Build with Energy.  Build with Integrity.  Build with Lingo.
  • Instagram - Black Circle
  • LinkedIn - Black Circle
  • Facebook - Black Circle

© 2019 Lingo Construction

Bethany Public Schools

2015 Bond Projects

Four of five distinct projects for the Bethany Public Schools 2015 bond issue: a 3 classroom elementary addition, a 2 classroom HS addition for math classes, a free standing building and parking lot known as the "STEM" Building (Science / Technology / Engineering / Mathematics) for secondary education and a new entry canopy for the High School. All projects were load bearing masonry and brick veneer with, structural steel and composite roof systems.

Architect:
-Troy D. Rhodes & Co., Inc.

Image Credits:
-©Brandon Snider Photography

LC Logo 2018.jpg